  • ETC of 3 No’s GT’s & Associated Auxiliaries for Aweer Power Station 'H' phase IV of ELSEWEDY POWER S.A.E, Dubai, UAE on 17th Jun 2019
  • Installation of Molten Salt Storage Tank foundation Ventilation pipe and Ring Wall for Solar Park at DEWA for HPCC SOLAR PARK of CEEG HPCC (China Energy Engineering Group Hunan Power Construction Co Ltd), Dubai, UAE  on 01st  Jun 2019
  • Part-A: Civil, Structural& Architectural Work for Main plant area of 1X660MW of BHEL, Bhusawal TPS & Part-B: Construction of 275M Height RCC Signle Flue Chimney with Borosolicate Glass block lining of 1X660MW  of BHEL, Bhusawal TPS, Maharashtra, India on 30th  May 2019
  • Erection, Testing & Assistance for commissioning and Trial Operation of 2x800MW of BHEL, Uppur Supercritical Thermal Power Project, Ramanathapuram District, Tamil Nadu, India on 22nd May 2019
  • Ventilation pipe and Ring Wall for Solar Park at DEWA for HPCC SOLAR PARK of CEEG HPCC (China Energy Engineering Group Hunan Power Construction Co Ltd), Dubai, UAE  on 06th May 2019
  • Fabrication, Supply, Erection and Alignment of Pre-Fabricated Steel Structure for Utility Corridor of  JSW Dolvi, Mumbai, Maharashtra, India on 11th Apr 2019
  • Supply, Fabrication and Erection of Prefabricated Steel Structure for SMS # 2, Package of JSW Dolvi, Mumbai, Maharashtra, India on 08th Apr 2019
  • Fabrication, Supply, Erection and Alignment of Pre-Fabricated Steel Structure for Nallah Crossing Bridge for RHMS of JSW Dolvi, Mumbai, Maharashtra, India on 08th Apr 2019 
  • Laying of OFC cable to entire route of the Pipeline, Installation, Commissioning, Performance testing and assistance start up for Mundra-Mithirohar Cross Country LPG Pipeline of HOWE Engineering projects India Pvt Ltd, Ahmedabad, Gujarat, India on 14th Feb 2019
  • Construction of PEB Sheds, Structural buildings, Road works, Track works, Electrical works, OHE Works, Signaling, Telecommunication works Installing & Commissioning of machinery and plants etc. for RVLN, Kanpur, Uttar Pradesh, India on 08th Feb 2019
  • Erection, Installation, Testing, Commissioning of Power Cycle Piping for TG, LP Piping project 1 x 800 MW set of BHEL PSSR at North Chennai Stage III Ponneri Taluk, Thiruvallur District, Tamil Nadu, India on 31st Jan 2019